Skip to Main content Skip to Navigation
Conference papers

Smart Interfaces for New Building Design Process

Abstract : Building information modeling opened new horizons for designing future urban spaces. Logistics and mobility issues are difficult to take into account during the construction process, as they require a precise global vision and the access to information yields by different building departments (architecture, methods, structure...). This contribution proposes a novel approach, based on a collaborative framework, to develop the building model, that is to ensure the quality of logistic and mobility during construction, with a time-efficient methodology.
Complete list of metadatas

Cited literature [10 references]  Display  Hide  Download

https://hal.uvsq.fr/hal-02541482
Contributor : Sylvain Chevallier <>
Submitted on : Monday, April 13, 2020 - 9:54:23 PM
Last modification on : Thursday, April 16, 2020 - 1:38:30 AM

File

HugoMartin-LMSM.pdf
Files produced by the author(s)

Identifiers

  • HAL Id : hal-02541482, version 1

Collections

Citation

Hugo Martin, Sylvain Chevallier, Eric Monacelli. Smart Interfaces for New Building Design Process. IEEE Last Mile Smart Mobility, Nov 2016, Vélizy, France. ⟨hal-02541482⟩

Share

Metrics

Record views

9

Files downloads

8