Smart Interfaces for New Building Design Process - Université de Versailles Saint-Quentin-en-Yvelines
Conference Papers Year : 2016

Smart Interfaces for New Building Design Process

Hugo Martin

Abstract

Building information modeling opened new horizons for designing future urban spaces. Logistics and mobility issues are difficult to take into account during the construction process, as they require a precise global vision and the access to information yields by different building departments (architecture, methods, structure...). This contribution proposes a novel approach, based on a collaborative framework, to develop the building model, that is to ensure the quality of logistic and mobility during construction, with a time-efficient methodology.
Fichier principal
Vignette du fichier
HugoMartin-LMSM.pdf (2.18 Mo) Télécharger le fichier
Origin Files produced by the author(s)
Loading...

Dates and versions

hal-02541482 , version 1 (13-04-2020)

Identifiers

  • HAL Id : hal-02541482 , version 1

Cite

Hugo Martin, Sylvain Chevallier, Eric Monacelli. Smart Interfaces for New Building Design Process. IEEE Last Mile Smart Mobility, Nov 2016, Vélizy, France. ⟨hal-02541482⟩
80 View
43 Download

Share

More